STATUS

Completed

Location

East Palatka, FL

Duration

120 days

Completion Date

June 2019

Size

6,000 SF

About the Project

Construct a 6,000 sqft pre-engineered metal building. The building is divided in to two spaces: office/dorms and vehicle bay. The building will have 8 sleeping quarters, a kitchen, and 2 offices. The interior space will be metal stud framing, drywall, VCT, and ACT. The vehicle bay will have (3) bays with (6) overhead coiling doors.